Water and Sewer
For questions or concerns regarding the Village of Cazenovia Water System contact:
Bethany Macera, Water Superintendent
Administrative Phone Line: 315 655-3041 Ext. 2
Fax: (315)-655-4475
Cell: (315)-436-9576
E-mail: Cazwater@outlook.com
The Village of Cazenovia Water Department will be flushing and testing fire hydrants in the Village from June 11, 2024-June 13, 2024. During this time, residents may notice some discoloration of their water and are advised to run the water to clear it. We apologize for any inconvenience. Thank you.
FACTS AND FIGURES ON THE
CAZENOVIA VILLAGEWATER SYSTEM
- Average volume of water pumped per day: 256,000 gallons
- Average volume of water pumped per year: 93,440,000 gallons
- Fire hydrants: 142
- Population served: 3200
- Service Connections: Approximately 931
- Total storage tank capacity: 800,000 gallons
- Miles of pipe: 12
Fact Sheet-Stormwater Remediation
LSLI_NY2600033_Nelson Purchase District
LSLI_NY2602371_Village of Cazenovia
WATER RATE SCHEDULE -10/15/2024
Amount of Water Used 0 – 18000 Gals. 18001 – 24000 Gals. 24001 – 48000 Gals.48001 – 75000 Gals.Over — 75001 Gals. Outside Users *Commercial Users |
Rate $4.15 / per 1000 Gals. $4.47 / per 1000 Gals. $4.68 / per 1000 Gals. $5.19 / per 1000 Gals $5.48 / per 1000 Gals. $6.60 / per 1000 Gals$4.29 / per 1000 Gals. |
Sewer rents, where applicable, are based on 30% of the water consumption.
Note: Any usage under 18000 Gals is charged a minimum charge of $74.70 plus sewer rents. If you have questions about this notice, please feel free to call Bill Carr, Public Works Administrator at 655-3041.
*This class is for commercial users who use in excess of 50,000 cubic feet of water during the billing period.
A BRIEF HISTORY OF THE CAZENOVIA VILLAGE WATER SYSTEM
- 1890: 8 million gallon reservoir built near Stone Quarry Road
- 1890-1898: Pipe line installed
- 1946: Wells drilled
- 1957: 300,000 gallon tank built off Pine Lane
- 1958: Wells put on line
- 1958: Pump house built
- 1958: Three softeners installed
- 1958: 300,000 gallon tank put in use
- 1991: 50 HP pump added
- 1991: 500,000 gallon tank built near Rte 20/Stone Quarry Rd
- 1991: Fourth water softener added
- 1991: 125 kW generator added
SANITARY SEWER
For questions about the Village of Cazenovia Sanitary Sewer contact:
Jim Cunningham
Cazenovia Wastewater Treatment Plant
Town of Cazenovia Sewer District
Route 13 North
Cazenovia, NY 13035
Phone: (315)-655-9213