Water and Sewer

For questions or concerns regarding the Village of Cazenovia Water System contact:

Bethany Macera, Water Superintendent
Administrative Phone Line: 315 655-3041  Ext. 2
Fax: (315)-655-4475
Cell: (315)-436-9576
E-mail: Cazwater@outlook.com

 The Village of Cazenovia Water Department will be flushing and testing fire hydrants in the Village from June 11, 2024-June 13, 2024.  During this time, residents may notice some discoloration of their water and are advised to run the water to clear it.  We apologize for any inconvenience.   Thank you.

FACTS AND FIGURES ON THE
CAZENOVIA VILLAGEWATER SYSTEM

  • Average volume of water pumped per day: 256,000 gallons
  • Average volume of water pumped per year: 93,440,000 gallons
  • Fire hydrants: 142
  • Population served: 3200
  • Service Connections: Approximately 931
  • Total storage tank capacity: 800,000 gallons
  • Miles of pipe: 12

Village of Caz 2018 AWQR

Village of Caz 2019 AWQR

Village of Caz 2020 AWQR

Village of Caz 2021 AWQR

Village of Caz 2022  AWQR

Village of Caz 2023 AWQR

 

Fact Sheet-Stormwater Remediation

FAQ_StormwaterRunoff

Stormwater Management

Misc Water Rates June-1-2022

 

WATER RATE SCHEDULE

Amount of Water Used     Rate
0 – 18000 Gals.                $3.84 / per 1000 Gals.
18001 – 24000 Gals.        $4.14 / per 1000 Gals.
24001 – 48000 Gals.        $4.33 / per 1000 Gals.
48001 – 75000 Gals.        $4.81 / per 1000 Gals.
Over — 75001 Gals.         $5.07 / per 1000 Gals.
Outside Users                   $6.11 / per 1000 Gals.
*Commercial Users           $3.97 / per 1000 Gals.
Sewer rents, where applicable, are based on 30% of the water consumption. Note: Any usage under 18000 Gals is charged a minimum charge of $68.88 plus sewer rents. If you have questions about this notice, please feel free to call Bill Carr, Public Works Administrator at 655-3041 or Dave Porter, the water and sewer commissioner, at 289-3140.
*This class is for commercial users who use in excess of 375,000 Gals of water during the billing period.

 

A BRIEF HISTORY OF THE CAZENOVIA VILLAGE WATER SYSTEM

  • 1890: 8 million gallon reservoir built near Stone Quarry Road
  • 1890-1898: Pipe line installed
  • 1946:  Wells drilled
  • 1957:  300,000 gallon tank built off Pine Lane
  • 1958:  Wells put on line
  • 1958:  Pump house built
  • 1958:  Three softeners installed
  • 1958:  300,000 gallon tank put in use
  • 1991:  50 HP pump added
  • 1991:  500,000 gallon tank built near Rte 20/Stone Quarry Rd
  • 1991:  Fourth water softener added
  • 1991:  125 kW generator added

SANITARY SEWER

For questions about the Village of Cazenovia Sanitary Sewer contact:

Jim Cunningham
Cazenovia Wastewater Treatment Plant
Town of Cazenovia Sewer District
Route 13 North
Cazenovia, NY 13035
Phone: (315)-655-9213

Upcoming Events
October 2024
M T W T F S S
 123456
78910111213
14151617181920
21222324252627
28293031  

Copyright © 2012. All Rights Reserved.